Developing the Talitsky area of Verkhnekamsk potassium-magnesium salt deposit in Perm Krai
- 60
m tKCl reserves
(JORC) - 2
mtpaof potassium chloride
(can be increased to 2.6 mtpa)
In 2008, Acron Group member Verkhnekamsk Potash Company (VPC) obtained a licence to develop the Talitsky area of the Verkhnekamsk potassium-magnesium salt deposit in Perm Krai, and currently is building a mining and processing complex. The project is aimed at completing Acron Group’s vertical integration by creating a potash raw material base for complex fertiliser production.
Talitsky Mine Key Parameters
- Mineral resources under JORC (Measured and Indicated)* — 719.4 mn t // 35.56% KCl // 255.8 mn t KCl
- Ore reserves under JORC (Proven and Probable)* — 190.7 mn t // 31.4% KCl // 59.9 mn t KCl**
- Mine capacity: 2 mn t of KCl with further expansion to 2.6 mtpa
- The project is being implemented with the participation of Sberbank Investments
Project Stages
2019
- Shaft sinking underway
- A special investment contract was signed with the Ministry of Industry and Trade of the Russian Federation and the Government of Perm Krai.
- Start of shaft sinking
- Obtaining Rosgeolekspertiza Expert Approval No. 277-02-04/2018 dated 12 November 2018 for “Geological Survey Including Exploration and Estimation of Potassium-Magnesium Salts at the East Talitsky Area of the Verkhnekamsk Deposit”
- Drafting working documentation for construction of the Talitsky mine’s facilities and related infrastructure
- Obtaining subsoil licence No. ПЕМ 02683 ТП for geological study of subsoil resources of the East Talitsky area of the Verkhnekamsk potassium-magnesium salt deposit
- Approval by the Ministry of Natural Resources and Environment in Perm Krai of the basic engineering design documentation for the following projects: Development of Ground Construction Materials Deposits “Talitsky Open Pits 1 and 2” and “Talitsky Open Pit 3”. The open pits will supply ground materials required for construction of the Talitsky mine’s surface facilities
- Completion of general preparations for vertical shaft freezing and sinking
- Approval by GlavGosExpertiza of the third project stage (construction of a surface complex)
- Amendment of subsoil licence No. ПЕМ 15349 for the Talitsky area to extend the licence term through 2053
- Continuing the construction of temporary buildings and structures for freezing and shaft sinking
- Approval by GlavGosExpertiza of the second project stage (construction of the underground mine)
- Continuing construction of temporary buildings and structures for freezing and shaft sinking
- Assembling equipment for the freezing plant and brine pipes for shaft sinking
- Commissioning of an administrative building for contractors
- Commissioning of the Talitskaya-1 main step-down substation, which will provide the mine site with electricity during construction
- Commissioning accommodations for 250 people
- Completing freezing holes for soil freezing for shaft sinking
- Signing a contract for shaft sinking
- Completing levelling for construction of beneficiation factory, concrete mixer and arch warehouses
- Commissioning of an administrative building for VPC workers
- Approval of the first project stage (construction of vertical shafts) by GlavGosExpertiza, Russia’s main state expert review board
- Geological exploration
2018
2017
2016
2015
2014
2013
2012
2009–2011
Main Provisions of the Licence Agreement (including amendments dated 29 March 2016)
The deadline for reaching design capacity is established in the approved mine development engineering design.
Reserves
Talitsky Area Balance Reserves (Minutes of Federal Subsoil Resources Management Agency Rosnedra No. 2809 dated 29 June 2012)
Balance Reserves (sylvinite) |
Mineral Salt, '000 t | K₂О, '000 t | KCl, '000 t |
---|---|---|---|
А | 86,334 | 18,973 | 30,029 |
В | 218,617 | 49,588 | 78,487 |
С1 | 421,124 | 94,442 | 149,477 |
А+В+С1 | 726,075 | 163,033 | 257,993 |
Talitsky Ore Reserves under JORC
Category | Amount, mn t | KCL, % | KCL, mn t ** |
---|---|---|---|
Proved reserves | 72.3 | 34.5 | 24.9 |
Probable reserves | 118.4 | 29.6 | 35.0 |
Total | 190.7 | 31.4 | 59.9 |
* Mineral resource and ore reserve statement on the Talitsky potash project, Berezniki, Russia (SRK Consulting, 2016)
** Calculated based on SRK Consulting data